OmniPlan for Mac 3.7.3

September 25, 2017

Requires OS X 10.11

OmniPlan 3.7.3 for Mac is a minor update intended to address compatibility issues with macOS 10.13 High Sierra.

  • About — Restored missing App icon in the About panel.
  • Calendar View — Fixed a High Sierra compatibility issue that could cause only Monday to be displayed in Calendar View.

OmniPlan for Mac 3.7.2

May 18, 2017

Requires OS X 10.11

OmniPlan 3.7.2 is a minor update focused on bug fixes.

  • Filtering — Fixed a bug that could prevent filters from saving values for effort, duration, and variance.
  • Filtering — OmniPlan no longer allows attempting to sort a filtered flat list.
  • Import — Tasks imported from .ooutline files now import in the correct order.
  • Inspectors — Restored “0” place holder value to lead/lag field.
  • Localizations — The in-app Help is once again localized.
  • Microsoft Project Import — Fixed a regression in our Microsoft Project import tool that could cause some .mpp files to fail to import.
  • Localizations — Dashboards are fully localized again.
  • Network View — Fixed a bug that caused some variables not to update correctly in Network view.
  • Performance — Improved Inspector performance when switching between tasks in a large OmniPlan project.
  • Resources — OmniPlan now cleans up references to resources that no longer exist in a file (these references could cause OmniPlan to hang or crash).
  • Scheduling — Resource leveling no longer ignores project non-working days.
  • Scheduling — Tasks now immediately reschedule to a resource’s next working period after a resource is assigned.
  • Scheduling — “Resources Work Independently” once again correctly respects earliest resource availability.
  • Task Cost — Fixed a bug that caused OmniPlan to fail to read task cost for tasks with fixed durations.
  • Stability — Attempting to edit a value in the read-only Hierarchical Title column no longer triggers a crash.
  • Stability — Fixed a crash that could occur when attempting to undo leveling.
  • Stability — Addressed a crash computing critical path when a schedule recursion is encountered in projects that share resource loads.
  • Stability — Fixed a bug that could cause OmniPlan to crash when opening a file with external dependencies.
  • Stability — Selecting “Add Dependent” in the contextual menu no longer triggers a crash.
  • Stability — Fixed a crash that could occur when outdenting a task that is part of a dependency loop.
  • Stability — Fixed a bug that could cause OmniPlan to crash when using Help > Contact Omni to send in an anonymized file.

OmniPlan for Mac 3.7.1

April 25, 2017

Requires OS X 10.11

OmniPlan 3.7.1 is a bug fix update.

  • Gantt — Addressed a bug that could prevent changing the duration of a task by dragging in the Gantt if the “Adjust Assigned Amounts” resource allocation option is selected.
  • Inspectors — Addressed a layout bug that could cause the end of a project’s Gantt chart to be hidden “under” the Inspector sidebar.
  • Scheduling — Restored the ability to set effort and duration independently when no resource is assigned to a task.
  • Scheduling — Restored the ability to change a task’s effort via the Inspector or task outline when the task’s resource allocation is set to “adjust task effort.”
  • Scheduling — It is once again possible to enter negative values for task lead/lag time.
  • Stability — Fixed a crash that could occur when leveling splits a task in a dependency loop.
  • Stability — Addressed a crash that could occur when deleting a task with a prerequisite.

OmniPlan for Mac 3.7

April 17, 2017

Requires OS X 10.11

OmniPlan 3.7 for Mac introduces support for elapsed time values for task duration and lead/lag times. This release also includes new menu items for quickly customizing your view, import support for .ooutline files (created by OmniOutliner 5) and .tsv files, and a wide range of bug and stability fixes.

A note about backwards compatibility: OmniPlan 3.7 for Mac and the corresponding iOS release, OmniPlan 3.5 for iOS, contain changes to OmniPlan’s scheduling logic, syncing, and change tracking. If you’re syncing OmniPlan 3 projects between multiple devices, you should update all installations of OmniPlan to the most recent version.

  • Elapsed Duration — OmniPlan now supports elapsed time values for task duration and lead/lag time! By default, OmniPlan calculates task duration and lead/lag time from the project’s work hours. Entering an “e” before either value will now convert it to an elapsed time value instead. Need to wait for the paint to dry before you can take the next step in your project? Enter “48eh” in your “Let paint dry” task’s duration field to tell OmniPlan that the next dependent task can begin Monday morning if the paint has started to dry by the end of the day Friday (and assigning additional resources to watch the paint dry won’t help it complete any earlier). OmniPlan does not yet support importing or exporting Microsoft Project elapsed time values.
  • Menu Bar — The Gantt, Resource Timeline, and Calendar, as well as the outlines in each of these views, can now be hidden or revealed by options in the View menu in the OmniPlan menu bar.
  • OmniOutliner — Added import support for OmniOutliner 5’s .ooutline file format.
  • Import — Importing .tsv files is now supported.
  • Help — The in-app Help is now localized in all languages except for Korean and Brazilian Portuguese.
  • Outline — Columns in the outline can now be resized by dragging the divider line (previously, columns could only be resized by selecting the column header).
  • Scheduling — Cleaned up and rewrote the code OmniPlan uses to schedule project timelines. This is intended to make project scheduling more accurate by addressing things like rounding errors. As a result, you may notice slight changes in your project’s schedule after installing this update. If you are confused about why your project’s schedule as changed, or feel that it has changed in a way that it shouldn’t have, please contact our Support team!
  • Publish/Subscribe — Substantial updates were made to OmniPlan’s publish/subscribe mechanism in order to improve speed and better handle authentication challenges.
  • AppleScript — AppleScript now properly sets project level custom data values.
  • Calendar View — Clicking the green “Customized Work Week” icon now switches to Calendar View to reveal the resource’s work schedule.
  • Calendar View — It is once again possible to clear a resource’s customized work schedule.
  • Change Tracking — The change tracking sidebar has been disabled in the Styles View as this view does not support change tracking.
  • Change Tracking — Addressed a typo in the resource assignment change tracking message.
  • Change Tracking — Change tracking now correctly reports changes that affect both task duration and task effort.
  • Daylight Savings Time — Daylight Savings Time beginning or ending no longer confuses OmniPlan’s date display.
  • Earned Value — ACWP values now calculate correctly when a resource is assigned at less than 100% to a task.
  • Export — End constraint brackets are no longer backwards when exporting to PDF.
  • Gantt View — Addressed a bug that could cause dependency connection arrows to remain on the Gantt chart after tasks are disconnected.
  • Inspectors — Addressed a bug that could prevent editing dependencies for some tasks in the Task Inspector.
  • Microsoft Project Import — Fixed a variety of bugs that could block Microsoft Project files from importing correctly.
  • Network View — It is now possible to edit the name of a task in Network View while zoomed out.
  • Network View — The Network View no longer scrolls back to the beginning of the project after a task is deleted.
  • Network View — “Add Task” with a child task selected in the Network Diagram now creates a task in the same group.
  • Performance — Setting a start constraint 100 years in the past no longer causes performance issues.
  • Publish/Subscribe — OmniPlan now syncs more happily with Server.app.
  • Publish/Subscribe — Addressed a bug that could cause pub/sub actions to duplicate. This bug was most commonly encountered when a file with pub/sub actions was also being syncing via OmniPresence.
  • Publish/Subscribe — Trust certificate panel now appears for self-signed WebDAV servers.
  • Publish/Subscribe — It is now possible to delete more than one project at a time from the Server Repository window.
  • Resource View — Resources can once again be assigned by dragging resources from the Resource View outline to tasks in a swim lane.
  • Scheduling — Tasks set to “adjust assigned amounts” no longer max resource allocation out at 100% (as a result, resources now accurately indicate when they are overloaded).
  • Scheduling — Removing all work hours from a project no longer results in tasks with no effort and duration.
  • Split Tasks — Split tasks now remain split when the first half of the task is dragged in the Gantt chart.
  • Task Completion — Addressed a rounding error that could cause tasks to be > 99% complete instead of 100% complete.
  • Stability — Constraints that result in a scheduling recursion now present a violation instead of causing OmniPlan to crash.
  • Stability — The Resource Assignments Touch Bar button no longer triggers a crash when resources have unexpected names.
  • Stability — Fixed our most common crash in OmniPlan 3.6.2.

OmniPlan for Mac 3.6.2

December 16, 2016

Requires OS X 10.11

OmniPlan 3.6.2 is a minor update.

  • Mac App Store — Pro In-App Purchase price now properly reflects previous Standard purchase.