Version 3.12
OmniPlan 3.12 introduces support for viewing full task names in the Network View. This release also includes numerous bug and stability fixes.
- Network View — Full tasks names are now displayed in the Network View.
- Network View — Task data is now displayed in a tooltip when the cursor is hovered over a variable in a task node (helpful when the variable is too long to be fully displayed in the node).
- CSV Export — CSV exports now include additional Duration & Effort columns that display values in the smallest unit configured in the Project Formats Inspector.
- Change Tracking — Reduced crowding in the Change Tracking bar by moving the Accept All and Reject All options into a gear menu.
- Dark Mode — Improved Dark Mode appearance throughout OmniPlan.
- Leveling — Leveling a project now schedules uncompleted tasks for the beginning of the next project work day (previous versions of OmniPlan 3 scheduled tasks for the beginning of the current work day when leveling).
- Network View — Network View now automatically scrolls to reveal the leftmost task node.
- Catch Up — Text entered in the Catch Up as of box is no longer ignored if you click OK before hitting tab or enter.
- CSV Import/Export — Exported CSV files now import correctly in non-English localizations.
- Dashboard [PRO] — The Resources option in the Dashboard’s View menu now stays disabled when the option is unchecked.
- Filters — The applied filter is no longer removed after new changes to the filter are saved.
- Filters — Fixed a bug that could cause a “Custom” filter to be applied instead of a newly saved named filter.
- Gantt — Group completion now redraws correctly in the Gantt when a milestone is marked complete.
- Group Tasks — Fixed a bug that could cause group task durations to display a blank or incorrect value.
- HTML Reports [PRO] — Report templates with multiple uses of a given looping token now produce the correct output.
- HTML Reports [PRO] — Fixed a bug that could cause the Resource Timeline to be cut off in the Report window.
- Leveling — Fixed a bug that could cause leveling involving split tasks to hang.
- Network View — Enabling a task variable with a long title no longer causes other data in task nodes to truncate.
- Network View — The Critical Path menu item now toggles critical path state in the Network View correctly.
- OmniGraffle Export — Fixed a bug that could result in incorrect dependency lines or missing tasks when exporting to OmniGraffle.
- Performance — Improved Resource View performance.
- Printing — Printing now respects visible scale when Zoom has been used to adjust Gantt scale.
- Scheduling — OmniPlan no longer presents unnecessary “The end date must come before start date” alerts when opening some projects.
- Schedule Exceptions — Daylight Savings Time no longer causes unexpected exceptional days to appear in workweek schedules that include Sundays.
- Server Accounts [PRO] — Account Name field now corrects capitalization in Omni Sync Server account names.
- Task Inspector — Changing a task’s type in the Inspector no longer discards pending task title changes.
- Task Notes — OmniPlan no longer allows you to attempt to paste an image into the Notes field.
- Task Outline — Disabled the pop-up calendar in the task outline when working with projects that use undetermined dates.
- Templates — Fixed a bug using the Edit a Copy option in the Templates Preference pane.
- Undetermined Date Entry — OmniPlan once again supports entering “T-” for task dates in projects with undetermined dates.
- Violations — Resolved violation icons now disappear from task outline correctly after leveling.
- Stability — Sorting resources by resource type no longer causes OmniPlan to crash.
- Stability — Improved overall app stability.